Click on any of the images below to see the previous episodes
0
Leif finishes the machining of the plug inserts and Joins the doner piece to the body and starts welding (3:58)
Day 11
Day 10
Day 9
0
0
0
Leif and John continue pulling the Ferrari and cut the center tunnel to match the cuts made on the donor piece. (3:53)
Leif removes the A-pillar from the Ferrari and trims the donor piece. (3:27)
Leif and John remove the rear bulkhead and pull the Ferrari to remove a kink in one of the rear cross members . (3:15)
Day 8
Day 7
Day 6
Day 5
0
0
0
0
Leif and John remove the pedal assembly from the Ferrari, the lines running down the center tunnel, and the left radiator. (2:32)
Leif takes the donor piece from another Ferrari to Media Blasters. There, the piece is cleaned using ground up walnuts shot from a high pressure hose. (2:41)
Leif and John remove the top from the Ferrari, the second gas tank, and work on the harness. (3:52)
Leif and John clear the center tunnel, remove the gas tank, and continue the pull.
Day 4
Day 3
Day 2
Day 1
0
0
0
0
Watched by students from Springdale JCC, Leif and John from Car Bench start to pull the Ferrari into shape.(2:48)
Leif and the guys from Car Bench put the Ferrari on the rack. Then, Leif removes the front bumper and the dash. (5:19)
Watch as Leif takes the engine out of the Ferrari. (4:27)
Watch as Leif starts the process of tearing the Ferrari apart and assessing the damage. (5:05)